Case Study: Small Retail Shop Switchboard
Version 1.0
1. Project Overview
This case study demonstrates the complete drafting workflow for a small commercial retail shop.
The objective is to convert the engineer's Design Intent into a complete manufacturing drawing package.
Although this is a simplified example, the workflow follows the same process used in real switchboard drafting projects, and strictly follows the Input & Output Specification.
2. Input Documents
2.1 Design Specification
Project:
Small Retail Shop
Supply:
400V 3 Phase 50Hz
Main Protection:
63A 4 Pole MCCB
Board Type:
Wall Mounted
IP Rating:
IP42
Cable Entry:
Top Entry
Standards:
AS/NZS 3000
AS/NZS 61439
2.2 Single Line Diagram
Incoming Supply
|
63A MCCB
|
-----------------------
| | |
20A 32A 25A
Light Power HVAC
2.3 Equipment Schedule
| Item | Manufacturer | Model |
|---|---|---|
| Main MCCB | Schneider | EZC100 |
| MCB | Schneider | Acti9 |
| RCBO | Schneider | Acti9 RCBO |
2.4 Load Schedule
| Circuit | Protection |
|---|---|
| Lighting | 20A MCB |
| General Power | 32A RCBO |
| HVAC | 25A MCB |
2.5 Site Information
Location:
Retail Shop
Mounting:
Wall Mounted
Cable Entry:
Top
Maximum Width:
800mm
Maximum Height:
1200mm
2.6 Applicable Standards
AS/NZS 3000
AS/NZS 61439
3. Output Documents
3.1 Single Line Diagram
Result
Incoming Supply
|
63A MCCB
|
Main Busbar
|
-----------------------
| | |
20A 32A 25A
Light Power HVAC
Drafting Outline
- Read the Design Specification.
- Confirm incoming supply.
- Place the main MCCB.
- Draw the main busbar.
- Add all outgoing protection devices.
- Label each circuit.
3.2 General Arrangement Drawing
Result
Front View
+----------------------+
| 63A MCCB |
|----------------------|
|20A|32A|25A |
|MCB|RCBO|MCB |
|----------------------|
| Terminal Blocks |
+----------------------+
600W × 800H × 250D
Drafting Outline
- Select cabinet size.
- Position the main switch.
- Arrange DIN rail devices.
- Reserve cable space.
- Add dimensions.
3.3 Internal Layout Drawing
Result
Door
MCCB
DIN Rail
MCB RCBO MCB
Terminal Blocks
Top Cable Entry
Drafting Outline
- Place all devices.
- Check maintenance clearance.
- Add DIN rails.
- Add terminal blocks.
- Add cable routing.
3.4 Manufacturing Drawing
Result — Contains:
- Door cut-outs
- Mounting holes
- DIN rail dimensions
- Cable entry plate
- Busbar mounting
Drafting Outline
- Measure device dimensions.
- Create mounting holes.
- Define cut-outs.
- Add fabrication dimensions.
3.5 Wiring Diagram
Result
MCCB
|
Busbar
|
20A MCB ---- Lighting
32A RCBO --- General Power
25A MCB ---- HVAC
Drafting Outline
- Assign terminal numbers.
- Create wire numbers.
- Connect devices.
- Verify continuity.
3.6 Bill of Materials
Result
| Qty | Description | Model |
|---|---|---|
| 1 | 63A MCCB | Schneider EZC100 |
| 1 | 20A MCB | Acti9 |
| 1 | 32A RCBO | Acti9 RCBO |
| 1 | 25A MCB | Acti9 |
Drafting Outline
- Count all devices.
- Verify manufacturer.
- Record model numbers.
- Generate BOM.
3.7 Cable Schedule
Result
| Cable | From | To | Size |
|---|---|---|---|
| C01 | Supply | MCCB | 16 mm² |
| C02 | MCCB | Lighting | 4 mm² |
| C03 | MCCB | Power | 6 mm² |
| C04 | MCCB | HVAC | 4 mm² |
Drafting Outline
- Identify every cable.
- Assign cable numbers.
- Record cable sizes.
- Define cable destinations.
4. Summary
This case study demonstrates the complete drafting process:
Design Specification
↓
Single Line Diagram
↓
Equipment Selection
↓
General Arrangement
↓
Internal Layout
↓
Manufacturing Drawing
↓
Wiring Diagram
↓
Bill of Materials
↓
Cable Schedule
This workflow represents the standard drafting process used by Shan Electrical Engineering Ltd for small switchboard projects and serves as the foundation for larger commercial and industrial switchboards.